| MATERIAL |
|
|
| CREATE-GENERAL |
MM01 |
IMMEDIETELY |
| |
MM11 |
SCHEDULE |
| CHANGE |
MM02 |
IMMEDIETELY |
| |
MM12 |
SCHEDULE |
| |
MM13 |
ACTIVATE |
| FLAG FOR DELETION |
MM06 |
IMMEDIETELY |
| |
MM16 |
SCHEDULE |
| DISPLAY |
MM03 |
DISPLAY CURRENT |
| |
MM19 |
DISPLAY AT KEY DATE |
| DISPLAY CHANGES |
MM04 |
ACTIVE CHANGES |
| |
MM14 |
SCHEDULE CHANGES |
| |
MM17 |
MASS MAINTENANCE |
| |
MMAM |
CHANGE MATERIAL TYPE |
| OTHER |
MMBE |
STOCK OVERVIEW |
| |
MMPV |
CLOSE PERIOD |
| |
MMRV |
ALLOW POSTING TO |
| |
|
PREVIOUS PERIOD |
| |
MM50 |
INSTANT MATERIAL VIEW |
| |
MMSC |
ENTER STORAGE LOCATIONS |
| |
MM60 |
MATERIAL LIST |
| ARCHIVING(MATERIAL) |
MM71 |
ARCHIVE/DELETE |
| |
MM72 |
DISPLAY ARCHIVE |
| BILL OF MATERIAL (MATERIAL BOM) |
|
|
| |
CS01 |
CREATE |
| |
CS02 |
CHANGE |
| |
CS03 |
DISPLAY |
| EXTRAS |
CS28 |
ARCHIVING |
| |
CS20 |
MASS CHANGES |
| EVALUATION/BOM |
CS11 |
BOM MULTILEVEL |
| EXPLOSION/MATERIAL |
CS12 |
STRUCTURE MULTILEVEL |
| BOM |
CS13 |
SUMMURISED BOM |
| WORK CENTRES |
|
|
| |
CR01 |
CREATE |
| |
CR02 |
CHANGE |
| |
CR03 |
DISPLAY |
| |
CA85 |
REPLACE |
| CAPACITY |
CR11 |
CREATE |
| |
CR12 |
CHANGE |
| |
CR13 |
DISPLAY |
| HIERARCHY |
CR21 |
CREATE |
| |
CR22 |
CHANGE |
| |
CR23 |
DISPLAY |
| LINE HIERARCHY |
LDB1 |
CREATE |
| |
LDB2 |
CHANGE |
| |
LDB3 |
DISPLAY |
| REPORTING |
CR60 |
W/C INFORMATION SYSTEM |
| |
CR05 |
W/C LIST |
| |
CR06 |
COST CENTRE ASSIGNMENT |
| |
CR07 |
W/C CAPACITIES |
| |
CR08 |
W/C HIERARCHY |
| WHERE USED |
CA80 |
WORK CENTRE |
| |
CR15 |
CAPACITY |
| |
CR10 |
CHANGE DOCUMENTS |
| EXTRAS |
CR09 |
STD. TEXTS TASK LIST |
| |
CR41 |
ARCHIVING |
| ROUTING |
|
|
| STAD. ROUTING |
CA01 |
CREATE |
| |
CA02 |
CHANGE |
| |
CA03 |
DISPLAY |
| REF. OPERATION SETS |
CA11 |
CREATE |
| |
CA12 |
CHANGE |
| |
CA13 |
DISPLAY |
| RATE ROUTING |
CA21 |
CREATE |
| |
CA22 |
CHANGE |
| |
CA23 |
DISPLAY |
| REF. RATE ROUTING |
CA31 |
CREATE |
| |
CA32 |
CHANGE |
| |
CA33 |
DISPLAY |
| EXTRAS |
CA85 |
REPLACE W/C |
| MASS CHANGES |
CA95 |
REPLACE REF. OP. SET |
| |
CA75 |
REPLACE PRT |
| DELETE TASK LIST |
CA99 |
WITH ARCHIVING |
| |
CA98 |
W/O ARCHIVING |
| REPORTING |
CA80 |
WORK CENTRE |
| WHERE USED LIST |
CA90 |
REF. OP. SETS |
| |
CA70 |
PRODUCTION RESORCE TOOLS |
| COST CENTRE |
|
|
| |
OKKP |
MAINTAIN CONTROLLING AREA |
| |
KS01 |
CREATE COST CENTRE |
| |
KZS2 |
CREATE COSTING SHEET |
| |
KA01 |
CREATE PRI. COST ELEMENT |
| |
KA06 |
CREATE SEC. COST ELEMENT |
| |
KL01 |
CREATE ACTIVITY TYPE |
| |
KP26 |
ACTIVITY TYPE/PRICE PLANNING |
| SALES AND OPERATIONS PLANNING |
|
|
| PRODUCT GROUP |
MC84 |
CREATE |
| |
MC86 |
CHANGE |
| |
MC85 |
DISPLAY |
| GRAPHIC |
MC91 |
PRODUCT GROUP |
| |
MC92 |
OVERVIEW |
| PLANNING |
MC81 |
CREATE |
| FOR PRODUCT GROUP |
MC82 |
CHANGE |
| |
MC83 |
DISPLAY |
| |
MC75 |
TRANSFER PG TO PLANNING |
| FOR MATERIAL |
MC87 |
CREATE |
| |
MC88 |
CHANGE |
| |
MC89 |
DISPLAY |
| |
MC74 |
TRANSFER MATERIALS TO |
| |
MC9K |
MATERIAL AVAILABILITY |
| VERSION MANAGEMENT |
MC78 |
COPY |
| |
MC80 |
DELETE |
| FLEXIBLE PLANNING |
MC93 |
CREATE |
| PLANNING |
MC94 |
CHANGE |
| |
MC95 |
DISPLAY |
| |
MC9K |
MATERIAL AVAILABILITY |
| TOOLS/PLANNING TYPE |
MC8A |
CREATE |
| MACRO |
MC8B |
CHANGE |
| |
MC8C |
DISPLAY |
| EVENT |
MC64 |
CREATE |
| |
MC65 |
CHANGE |
| |
MC66 |
DISPLAY |
| ROUGH CUT PLANNING |
MC35 |
CREATE |
| PROFILE |
MC36 |
CHANGE |
| |
MC37 |
DISPLAY |
| ENVIRONMENT |
MC90 |
TRANSFER MATERIALS TO DM |
| ACTIVITY REQT. |
KSPP |
TRANSFER TO COST CENTRE |
| |
KSBL |
COST CENTRE PLANNING REPORT |
| |
KSOP |
TRANSFER TO ACTIVITY BASED COSTING |
| |
CPBL |
PLANNING REPORT PROCESSES |
| |
MC9C |
REPORTING |
| SETTINGS |
MC96 |
FORECAST PROFILE |
| DISSAGGRIGATION |
MC76 |
BREAKDOWN PG PLAN |
| |
MC77 |
DISPLAY PG PLAN |
| |
MC75 |
TRANSFER PG TO PLANNING |
| |
MC74 |
TRANSFER MATERIALS TO DM |
| FORECASTING |
|
|
| INDIVIDUAL FORECAST |
MP30 |
EXECUTE |
| |
MP31 |
CHANGE |
| |
MP32 |
DISPLAY |
| TOTAL FORECAST |
MP38 |
EXECUTE |
| |
MP33 |
REPROCESS |
| |
MP39 |
PRINT |
| |
MPBT |
EXECUTE BACKGROUND |
| |
MPDR |
PRINT BACKGROUND |
| DEMAND MANAGEMENT |
|
|
| PIR |
MD61 |
CREATE |
| |
MD62 |
CHANGE |
| |
MD63 |
DISPLAY |
| |
MD65 |
REQTS. FOR SCINARIO |
| |
MD66 |
COPY SIMULATED DEPENDENT REQT. |
| |
MD70 |
COPY TOTAL FORE CAST |
| EVALUATION |
MD73 |
DISPLAY TOTAL REQT. |
| |
MD79 |
EXCELL INTERFACE |
| |
MD4C |
ORDER REPORT |
| |
MD72 |
CHARECTERISTICS PLANNING |
| CUSTOMER REQT. |
MD81 |
CREATE |
| |
MD82 |
CHANGE |
| |
MD83 |
DISPLAY |
| REPETITIVE MANUFACTURING |
|
|
| MASTER DATA |
C223 |
PRODUCTION VERTION |
| PRODUCT COST PLANNING |
|
|
| COSTING RUN |
CKMATSEL |
CREATE |
| SELECTION LIST |
CKMATCON |
Edit |
| |
CK40N |
EDIT COSTING RUN |
| Master Data |
MD25 |
Create planning calendar |
| |
MD26 |
Change planning calendar |
| |
MD27 |
Display planning calendar |
| |
MDSA |
Display BOM explosion number |
| |
MDSP |
Edit BOM explosion number |
| |
MEQ1 |
Maintain quota file |
| |
OPPP |
Explode BOM by date |
| |
MDUS |
Display project assignment |
| |
MDUP |
Process project assignment |
| |
MDL1 |
Create production lot |
| |
MDL2 |
Change production lot |
| |
MDL3 |
Display production lot |
| Planning |
MD20 |
Create planning file entry |
| |
MD21 |
Display planning file entry |
| |
MDAB |
Set up planning file entry in background |
| |
MDRE |
Check planning file entry |
| |
MD01 |
Total planning online |
| |
MDBT |
Total planning in background |
| |
MD03 |
Single-item, single-level planning |
| |
MD02 |
Single-item, multi-level planning |
| |
MD43 |
Interactive single-item planning |
| |
MD50 |
Multi-level, make-to-order planning |
| |
MD51 |
Multi-level project planning |
| |
MF52 |
Display planning table |
| |
MF50 |
Change planning table |
| |
MF57 |
Planning table by MRP lists |
| |
MF51 |
Planning table by production list |
| Evaluations |
MD04 |
Stock/requirements list |
| |
MD07 |
Collective access of stock/requirements lis |
| |
MD05 |
MRP list |
| |
MD06 |
Collective access of MRP lists |
| |
MDLD |
Print MRP list |
| |
MD45 |
Planning result |
| |
MD46 |
Collective access of planning result |
| |
MD44 |
Planning situation for a material |
| |
MD47 |
Planning situation for a product group |
| |
MD48 |
Cross-plant planning situation |
| |
MD4C |
Order report |
| |
MD09 |
Pegged requirements |
| |
CO46 |
Order progress |
| Planned Order |
MD11 |
Create planned order |
| |
MD12 |
Change planned order |
| |
MD13 |
Individual access of planned order |
| |
MD16 |
Collective access of planned orders |
| |
MD14 |
Individual conversion of planned order into |
| |
MD15 |
Collective conversion of planned orders int |
| |
MDUM |
Convert planned order into purchase requisi |
| |
CO40 |
Convert individual planned order into produ |
| |
CO41 |
Collective conversion of planned orders int |
| |
CO48 |
Partial conversion of planned order into pr |
| |
COR7 |
Individual conversion of planned order into |
| |
COR7_PC |
Collective conversion of planned orders int |
| |
COR8 |
Partial conversion of planned order into pr |
| |
MDVP |
Collective availability check |
| |
MDAC |
Execute action for planned order |
| LONG TERM PLANNING |
|
|
| PALNNING SCENARIO |
MS31 |
CREATE |
| |
MS32 |
CHANGE |
| |
MS33 |
DISPLAY |
| PLANNING RUN |
MS01 |
ON LINE |
| |
MSBT |
SA BACKGROUND JOB |
| |
MS02 |
SINGLE ITEM – MULTI LEVEL |
| |
MS03 |
SINGLE ITEM – SINGLE LEVEL |
| |
MS50 |
SINGLE ITEM – SALES ORDER |
| |
MS51 |
SINGLE ITEM PLANNING, PROJECT |
| |
MFSO |
PLANNING TABLE |
| EVALUTIONS |
MS05 |
MRP LIST MATERIAL |
| |
MS06 |
MRP LIST COLLECTIVE DISPLAY |
| |
MSLD |
PRINT MRP LIST |
| |
MS04 |
STOCK/REQUIREMENTS LIST |
| |
MS07 |
STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY |
| |
MS44 |
PLANNING SITUATION MATERIAL |
| |
MS47 |
SITUATION PRODUCT GROUP |
| MPS-MASTER SCHEDULE |
ITEMS |
|
| TOTAL PLANNING |
MD40 |
ON LINE |
| |
MDBS |
SA BACKGROUND JOB |
| |
MD41 |
SINGLE ITEM – MULTI LEVEL |
| |
MD42 |
SINGLE ITEM – SINGLE LEVEL |
| |
MD43 |
SINGLE ITEM – INTERACTIVE |
| |
MD50 |
SINGLE ITEM – SALES ORDER |
| |
MD51 |
SINGLE ITEM PLANNING, PROJECT |
| *** EVALUTION IS SIMILAR TO MRP |
|
|
| PRODUCTION CONTROL |
|
|
| ORDER – CREATE |
CO01 |
WITH MATERIAL |
| |
CO07 |
WITHOUT MATERIAL |
| |
CO40 |
FROM PLANNED ORDER |
| |
CO41 |
COLLECTIVE CONVERTION OF PLANNED ORDER |
| |
CO08 |
FOR SALES ORDER |
| |
CO10 |
FOR PROJECT |
| |
CO02 |
CHANGE |
| |
CO03 |
DISPLAY |
| CONTROL |
MD04 |
STOCK/REQUIREMENTS LIST |
| |
COHV |
MASS PROCESSING |
| |
COMAC |
COLLECTIVE AVAILABILITY CHECK |
| |
CO05N |
COLLECTIVE RELEASE |
| |
CO04N |
PRINT |
| |
CO09 |
AVAILABILITY OVER VIEW |
| GOODS MOVEMENT |
MF65 |
STOCK TRANSFER FOR RESERVATION |
| MATERIAL STAGING |
MF68 |
LOG |
| |
MB1A |
GOODS ISSUE |
| |
MB31 |
GOODS RECEIPT |
| |
COWBPACK |
PACK MATERIAL |
| CONFIRMATION |
CO1V |
TIME TICKET |
| FOR OPERATION |
CO14 |
DISPLAY |
| |
CO13 |
CANCEL |
| |
CO1L |
REQUESTED CONFIRMATIONS |
| |
CO1P |
PREDEFINED PROCESSES |
| TOOLS-ARCHIVING |
CO78 |
ORDER |
| |
KOAA |
SETTELMENT DOCUMENTS |
| CAPACITY PLANNING |
|
|
| EVALUTION |
CM01 |
LOAD |
| |
|
|
| WORK CENTER VIEW |
CM02 |
ORDERS |
| |
CM03 |
POOL |
| |
CM04 |
BACKLOG |
| |
CM05 |
OVERLOAD |
| |
CM07 |
VARIABLE |
| EXTENDED EVALUTION |
CM50 |
WORK CENTER VIEW |
| |
CM51 |
INDIVIDUAL CAPACITY VIEW |
| |
CM52 |
ORDER VIEW |
| LEVELLING |
CM21 |
PLANNING TABLE (GRAPHICAL) |
| WORK CENTER VIEW |
CM22 |
PLANNING TABLE (TABULAR) |
| INDIVIDUAL CAPACITY |
VCM27 |
PLANNING TABLE (GRAPHICAL) |
| |
CM28 |
PLANNING TABLE (TABULAR) |
| ORDER VIEW |
CM31 |
PLANNING TABLE (GRAPHICAL) |
| |
CM32 |
PLANNING TABLE (TABULAR) |
| AVAILABLE CAPACITY |
CR12 |
CHANGE |
| CAPACITY |
CR13 |
DISPLAY |
| |
OP4A |
SHIFT SEQUENCE |
| |
OP43 |
FACTORY CALENDER |
Good Summary
Can more transaction codes can be added
I think these are pretty enough:)
I think the collection is good enough to suffice many requirement…..